Architecture Project Timeline Estimator

Choose the project type, size and complexity, then get a stage-by-stage programme on the RIBA Plan of Work or the AIA phases, with start and finish dates for each stage.

Free · No sign-up · Runs in your browser

How to use the project timeline estimator

Clients almost always ask two questions at the first meeting: how much will it cost, and how long will it take? This estimator answers the second one in a few seconds. It builds a programme from typical stage durations, then scales them for the type of building, its size and how complicated it is, so you can talk through a realistic timeline before you've drawn a line.

  1. Pick a framework. Choose the RIBA Plan of Work 2020 stages (common in the UK, Ireland, Australia and much of Asia) or the AIA phases used in North America.
  2. Describe the project: type, gross floor area in ft² or m², and complexity. Use "complex or listed" for heritage buildings, difficult sites, steep slopes or heavy consultant coordination.
  3. Set the approvals and tender time you expect locally. Planning permission, permits or design review go in the approvals field; contractor tendering or bidding goes in the tender field.
  4. Choose a start date. The table gives start and finish dates for every stage, and the summary shows total design time, time on site and the expected handover date.

How the timeline is calculated

Design stage weeks = base weeks × type design factor × (area ÷ 250 m²)^0.25 × complexity
Construction weeks = 40 × type build factor × (area ÷ 250 m²)^0.28 × complexity
Total = design stages + approvals + tender + construction + handover

The base durations describe a standard new house of about 250 m² (2,700 ft²). Duration doesn't rise in proportion to area: a building ten times bigger takes nowhere near ten times as long, because larger teams and crews work in parallel. That's why the size factor uses a low power, so 2,500 m² comes out at roughly 1.8 times the design time and 1.9 times the build time of the reference house. Type factors adjust for what is typical: fit-outs have short builds, civic and healthcare buildings need more consultation and coordination. Size scaling is limited to between 0.4 and 4 times the reference.

RIBA stageAIA equivalentBase weeks
0 Strategic Definition + 1 Preparation and BriefingPre-Design2 + 3
2 Concept DesignSchematic Design6
3 Spatial CoordinationDesign Development7
Planning / permitsPermittingYour input
4 Technical DesignConstruction Documents10
TenderBidding or NegotiationYour input
5 Manufacturing and ConstructionConstruction Administration40
6 HandoverCloseout4

In the RIBA sequence the planning application goes in after Stage 3, so approvals sit before Technical Design. In the AIA sequence, permits are usually applied for with the construction documents, so the permit period follows them. Either way, the estimator assumes stages run one after another; fast-track overlaps would shorten the total.

Worked examples

A new 2,500 ft² house (AIA)

Standard complexity, 10 weeks for permits and 6 weeks of bidding. Design phases total about 28 weeks and construction about 39 weeks; with permits, bidding and closeout the whole project runs about 87 weeks, roughly 20 months from the first meeting to move-in.

A 60 m² kitchen extension (RIBA)

Extension type, simple complexity, 8 weeks for a householder planning application and 4 weeks to tender. Design comes out at about 12 weeks and construction at about 14 weeks, so with approvals, tender and handover the project takes roughly 41 weeks, a little over 9 months.

A 5,000 m² office (RIBA)

Commercial type, complex, with 16 weeks for planning and 10 weeks to tender. Design stages run to about 78 weeks and construction to about 104 weeks, for a total of around 214 weeks, just over four years from Strategic Definition to Handover.

Who this estimator helps

  • Architects preparing fee proposals and resourcing plans, and setting expectations at the first client meeting.
  • Project managers and developers building a first programme for funding, land deals or lettings.
  • Interior designers scoping fit-outs and showing clients where design ends and site work begins.
  • Homeowners planning a new house or extension and wondering when they can move in.
  • Students and graduates learning how the RIBA and AIA stages fit together.

Practical tips

  • Pair the programme with money: estimate the build with the construction cost calculator, then split your fee across the same stages with the architect fee calculator.
  • Turn the brief into a structured questionnaire with the design brief generator so Stage 1 or Pre-Design doesn't drag on.
  • Add buffer for client decisions: two weeks of sign-off per stage is common and isn't included above.
  • Check the zoning envelope early with the setback calculator and FAR calculator; a redesign after a refusal can add months.
  • Order long-lead items such as windows, lifts and structural steel as soon as the design is fixed.

Speed up concept design by turning early sketches and massing models into photoreal images for client sign-off with Sketch to Render.

From numbers to pictures

See the space before it's built.

Once the plan works on paper, BasedFrame turns a sketch, a massing model or a site photo into a photoreal render in seconds. Try Sketch to Render or Room Redesign with free credits.

Try BasedFrame free

FAQ

Architecture Project Timeline Estimator FAQ

How long does an architecture project take from start to finish?

A typical new house of around 2,500 ft² (230 m²) takes roughly 18 to 24 months from first briefing to handover: about 6 to 9 months of design and approvals, 1 to 2 months to tender and appoint a builder, and 9 to 12 months on site. Small extensions can be done in under a year; larger commercial and public buildings often take three to five years.

What are the RIBA Plan of Work stages?

The RIBA Plan of Work 2020 has eight stages: 0 Strategic Definition, 1 Preparation and Briefing, 2 Concept Design, 3 Spatial Coordination, 4 Technical Design, 5 Manufacturing and Construction, 6 Handover and 7 Use. Planning applications are usually made at the end of Stage 3 and tendering usually happens during or after Stage 4.

What are the AIA phases of an architecture project?

The AIA's standard owner-architect agreements describe five basic phases: Schematic Design, Design Development, Construction Documents, Bidding or Negotiation, and Construction Administration. Many firms add a Pre-Design phase at the start for programming and feasibility, and a Closeout phase at the end.

How long does planning permission or a building permit take?

It depends heavily on the authority. In England the statutory target for a householder or minor application is 8 weeks and 13 weeks for major ones, though many take longer. In the US, a residential building permit takes anything from 2 weeks to 6 months depending on the city, and zoning variances or design review add more. Enter your local figure in the approvals field.

Which stage of an architecture project takes the longest?

Construction almost always takes the longest, typically half to two thirds of the total programme. Of the design stages, technical design or construction documents is usually the longest, because that is where the drawings, specifications and consultant coordination needed to build and price the project are produced.

How accurate is this project timeline estimate?

It's a planning-level estimate based on typical stage durations scaled by project type, size and complexity. Real programmes depend on how quickly the client makes decisions, consultant availability, approval queues, contractor capacity, lead times on materials and the weather. Use it for early conversations and fee planning, then replace it with a detailed programme.

Can design stages overlap to save time?

Yes. Fast-track or design-and-build procurement lets early packages such as groundworks or the frame start on site while later packages are still being designed. This can take several months off the total, but it increases the risk of changes and cost growth, so it suits clients who value speed over certainty.

How can I keep an architecture project on schedule?

Agree the brief and budget before concept design starts, set fixed dates for client sign-off at the end of each stage, submit complete planning or permit applications, start the tender early with a shortlist of builders and order long-lead items such as windows, lifts and steel as soon as the design is fixed.