Concrete Calculator

Pick a slab, footing or column, enter the dimensions and waste percentage. Get volume in cubic metres and cubic yards, and how many bags to buy.

Free · No sign-up · Runs in your browser

How to use the concrete calculator

Concrete is sold by volume, but most of the work on site is measured as length, width and thickness. Getting the conversion right — and adding enough waste — is what separates a clean pour from a frantic mid-afternoon call to the ready-mix plant.

  1. Choose the shape: slab (floor or patio), footing/pad, or column/pier.
  2. Set length units (feet or metres) and thickness units (inches or centimetres). Column diameter uses the thickness unit so you can enter 12 inches or 30 cm naturally.
  3. Enter the dimensions and a waste percentage (10% is a sensible default).

Results show volume in cubic metres and cubic yards, the volume with waste, and estimated bag counts for common US (40/60/80 lb) and metric (20/25/40 kg) bag sizes based on typical yields.

Concrete volume formulas

Slab / footing = Length × Width × Thickness
Rectangular column = Length × Width × Height
Round column = π × (Diameter ÷ 2)² × Height
yd³ = ft³ ÷ 27 · m³ = ft³ × 0.0283168
Order volume = Volume × (1 + Waste % ÷ 100)

Keep thickness in the same base unit before multiplying. Four inches is 4 ÷ 12 = 0.333 ft; 100 mm is 0.10 m. Ready-mix yards are ordered to 0.25 or 0.5 yd³ increments in many markets — round up to what your supplier will deliver.

Bag sizeTypical yieldBags per yd³ (approx.)
40 lb (US)0.30 ft³~90
60 lb (US)0.45 ft³~60
80 lb (US)0.60 ft³~45
20 kg~0.009–0.010 m³~100–110 per m³
25 kg~0.012–0.014 m³~75–85 per m³
40 kg~0.018–0.020 m³~50–55 per m³

Worked examples

A 20 × 10 ft patio slab, 4 inches thick

Volume = 20 × 10 × (4 ÷ 12) = 66.67 ft³ = 2.47 yd³ (1.89 m³). With 10% waste, order 2.72 yd³. In 80 lb bags at 0.60 ft³ each that is about ⌈66.67 × 1.1 ÷ 0.60⌉ = 123 bags — which is why a ready-mix truck is the usual choice above about a cubic yard.

A strip footing

A 40 ft long footing, 2 ft wide and 12 inches deep: 40 × 2 × 1 = 80 ft³ = 2.96 yd³. With 10% waste, plan on 3.26 yd³. Ask the engineer for the rebar schedule separately; volume alone does not size reinforcement.

Metric round piers

Six piers, each 300 mm diameter and 1.2 m deep. One pier is π × 0.15² × 1.2 ≈ 0.085 m³; six are 0.51 m³. With 10% waste, 0.56 m³ — roughly 40–45 of the 25 kg bags, or a small ready-mix order if the site allows.

Who this calculator helps

  • Architects checking early foundation and slab volumes for cost plans and coordinating with structural engineers.
  • Builders and concrete contractors estimating ready-mix orders and bag counts for small works.
  • Landscape designers sizing patio, path and pier pours.
  • Architecture and engineering students converting design dimensions into volumes for studio and lab work.
  • Homeowners planning a shed base, fence posts or a DIY patio before hiring a mixer.

Pour day tips

  • Confirm formwork is square and braced; volume assumes the forms hold their dimensions under pressure.
  • Have the waste allowance on site — short loads on a hot day set before a second truck arrives.
  • Match mix strength (for example 25 MPa / 3500 psi) to the specification; volume calculators do not choose the mix.
  • Measure the slab area with the square footage calculator, and for roof structures check pitch with the roof pitch calculator.

Exploring a concrete finish, board-formed walls or a polished slab look on the real building? Upload a photo and try it with Exterior Redesign.

From numbers to pictures

See the space before it's built.

Once the plan works on paper, BasedFrame turns a sketch, a massing model or a site photo into a photoreal render in seconds. Try Sketch to Render or Room Redesign with free credits.

Try BasedFrame free

FAQ

Concrete Calculator FAQ

How do I calculate concrete volume for a slab?

Multiply length × width × thickness, keeping every dimension in the same unit, then convert to cubic metres or cubic yards. A 20 × 10 ft slab that is 4 inches thick is 20 × 10 × (4 ÷ 12) = 66.67 ft³, or about 2.47 yd³.

How many bags of concrete do I need?

Divide the volume by the yield printed on the bag. As a rule of thumb, an 80 lb bag yields about 0.60 ft³, a 60 lb bag about 0.45 ft³ and a 40 lb bag about 0.30 ft³. Metric 25 kg bags are often around 0.012–0.014 m³ — check the bag.

Should I order extra concrete?

Yes. Add 5–10% waste for a simple slab, and 10% or more for footings, steps, piers and anything with irregular formwork. Running short mid-pour is far worse than having a leftover barrow-load.

How do I convert cubic feet to cubic yards?

Divide cubic feet by 27. One cubic yard is 27 ft³. Ready-mix is sold by the cubic yard in the US and by the cubic metre elsewhere (1 m³ ≈ 1.308 yd³).

What thickness should a concrete slab be?

Many residential slabs on grade are 4 inches (100 mm) for patios and sheds, and 4–6 inches for garage floors. Driveways and heavier loads often need 5–6 inches plus thicker edges. Structural slabs and foundations follow the engineer's specification, not a rule of thumb.

How do I calculate a round column or pier?

Volume = π × (diameter ÷ 2)² × height. A 12 inch diameter pier 4 ft tall is π × 0.5² × 4 ≈ 3.14 ft³. Use the column mode in the calculator and choose diameter.

When should I use ready-mix instead of bags?

Bags are fine for small pads, fence posts and repairs under about 0.5–1 yd³. Above that, ready-mix usually costs less per yard, places faster and gives a more consistent mix — especially for slabs you want to finish in one pour.

Does this include rebar or formwork?

No. The calculator covers concrete volume and bag counts only. Reinforcement, formwork, vapour barriers and labour are separate line items on a proper estimate.

Keep exploring